Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM)
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2015
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/id/eprint/25093/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:utpedia.utp.edu.my:25093 |
---|---|
record_format |
eprints |
spelling |
oai:utpedia.utp.edu.my:250932023-09-21T07:47:05Z http://utpedia.utp.edu.my/id/eprint/25093/ Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) Ty, Phuor TA Engineering (General). Civil engineering (General) 2015 Thesis NonPeerReviewed Ty, Phuor (2015) Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM). Masters thesis, Universiti Teknologi PETRONAS. |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Ty, Phuor Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
format |
Thesis |
author |
Ty, Phuor |
author_facet |
Ty, Phuor |
author_sort |
Ty, Phuor |
title |
Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
title_short |
Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
title_full |
Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
title_fullStr |
Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
title_full_unstemmed |
Prediction of the Total Cost and Time in Project Monitoring and Control of Offshore Pipeline Using Integrated Mathematical Matrix Method (IMMM) |
title_sort |
prediction of the total cost and time in project monitoring and control of offshore pipeline using integrated mathematical matrix method (immm) |
publishDate |
2015 |
url |
http://utpedia.utp.edu.my/id/eprint/25093/ |
_version_ |
1778164465661902848 |
score |
13.160551 |