Mathematical matrix method to predict project total cost & schedule

Traditionally the prediction of total project cost and schedule/time followed different methods and was based on the schedule of quantities and labors and on quantity of work and productivity, respectively. The major deficiency of the methods was that the calculations were independent. Change in sch...

Full description

Saved in:
Bibliographic Details
Main Authors: Ty, P., Potty, N.S., Akram, M.K.M.
Format: Article
Published: Research India Publications 2014
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84904468065&partnerID=40&md5=61c65f3d1065bd4ae0972ea5bcbfc9a9
http://eprints.utp.edu.my/32319/
Tags: Add Tag
No Tags, Be the first to tag this record!