Semi-quantitative risk assessment on the impact of port development to wellhead platform
Saved in:
Main Authors: | Hermansyah, Heri, Kumaraningrum, Anggraini R, Sommeng, Andy N, Wijanarko, Anondho, Sahlan, Muhamad, Shariff, Azmi M |
---|---|
Format: | Article |
Published: |
Wiley Online Library
2020
|
Online Access: | http://scholars.utp.edu.my/id/eprint/34556/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Semi-quantitative risk assessment on the impact of port development to wellhead platform
by: Hermansyah, H., et al.
Published: (2020) -
Semi-quantitative risk analysis of a normally unmanned installation facility
by: Kumaraningrum, Anggraini Ratih, et al.
Published: (2019) -
Development of semi-quantitative model for occupational stress risk assessment matrix at port terminal in Penang, Malaysia
by: Yakub @ Yakub, Norwahida
Published: (2021) -
Assessment, Mitigation, and Control of Potential Gas Leakage in Existing Buildings Not Designed for Gas Installation in Indonesia
by: Hermansyah, Heri, et al.
Published: (2018) -
Semi-quantitative Risk Assessment Matrix for Rotating Equipment
by: Wassan, Rano Khan, et al.
Published: (2014)