Increasing project success in wellhead and Christmas tree manufacturing equipment through risk management culture

The primary equipment for oil production, manufactured in a plant, is the wellhead and Christmas tree. By creating a standardized set of risk instruments and a risk management framework, embedding risk management into organizational culture will reduce the overhead of imposing risk management on e...

Full description

Saved in:
Bibliographic Details
Main Authors: Hamid, Abdul, Baba, Ishak, Tamin, Norfauzi, Darmawan, Agung Setyo, Sani, Winardi
Format: Conference or Workshop Item
Language:English
Published: 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/11374/1/P16748_4ef608c72a94a4cca31338c62b4eb03d%201.pdf
http://eprints.uthm.edu.my/11374/
https://doi.org/10.1051/e3sconf/202451715007
Tags: Add Tag
No Tags, Be the first to tag this record!