Performance evaluation of reusing produced water as fracking fluid in Angsi field
The demand for freshwater continuously increases with hydraulic fracturing operations, mainly due to unconventional reservoirs. For instance, approximately 7000�18,000m3 of water is required per well for hydraulic fracturing. Meanwhile, almost 100bbl of produced water is produced annually worldwid...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Published: |
Springer Science and Business Media Deutschland GmbH
2022
|
Online Access: | http://scholars.utp.edu.my/id/eprint/28643/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85118669910&doi=10.1007%2fs11696-021-01957-5&partnerID=40&md5=fb16f62088169c2d947ab0903bde2a1c |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!