Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
Saved in:
Main Authors: | Abdullah, M.S., Alaloul, W.S., Liew, M.S., Musarat, M.A. |
---|---|
Format: | Article |
Published: |
Springer Science and Business Media Deutschland GmbH
2021
|
Online Access: | http://scholars.utp.edu.my/id/eprint/23977/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85100735960&doi=10.1007%2f978-981-33-6311-3_67&partnerID=40&md5=1dfa794bfa02c9504bc26e05aac6cfc6 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
DEVELOPMENT OF ARTIFICIAL INTELLIGENT PREDICTION MODEL
FOR DELAYS AND COST OVERRUNS DURING THE CONSTRUCTION OF
PALM OIL REFINERY PROJECTS IN MALAYSIA
by: LIM ABDULLAH , MUHAMMAD SANI
Published: (2020) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018) -
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)