"B" Gas Plant Vessels Replacement look back at PT. XYZ
Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and ze...
Saved in:
主要作者: | |
---|---|
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://repo.uum.edu.my/15959/1/P36.pdf http://repo.uum.edu.my/15959/ http://stmlportal.net/ictom04/TOC.html |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|