"B" Gas Plant Vessels Replacement look back at PT. XYZ

Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and ze...

Full description

Saved in:
Bibliographic Details
Main Author: Zaluchu, Anna Lucky Meridiana
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15959/1/P36.pdf
http://repo.uum.edu.my/15959/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and zero accident related to H2S emission.• Reliability: zero downtime due to corrosion at compression system.• Budget compliance: the total spending is still within budget, about 63% of the total original budget.• Schedule: delay in construction execution.Design/Methodology/Approach – Major deviations of the project performance are investigated by using Root Cause Analysis (RCA). Findings – Based on the RCA, it’s found the critical items need to be improved for the future project.Research limitations / implications – This paper is intended as learning for college students, some data are not included in this paper due to company confidential. Original/Value – To present an original approach of look back that modelled after incident investigation system.