"B" Gas Plant Vessels Replacement look back at PT. XYZ
Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and ze...
Saved in:
Main Author: | Zaluchu, Anna Lucky Meridiana |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/15959/1/P36.pdf http://repo.uum.edu.my/15959/ http://stmlportal.net/ictom04/TOC.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Performance measurement in facility management department using balanced score card at PT. XYZ
by: Nurdiansyah, Tony
Published: (2014) -
Designing performance management system using balance scorecard for chemical services contractor in PT. XYZ
by: Syukirman, ,
Published: (2014) -
A recommendation for optimizing workflow process in Welldev Team for enhancing PT. XYZ world class performance
by: Pratiwi, R. Asri
Published: (2014) -
Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
by: Kusnadi, Asana
Published: (2014) -
A study of relationship between organisational culture and employee voice at XYZ Sdn Bhd
by: Lom, Hui Shan
Published: (2014)