"B" Gas Plant Vessels Replacement look back at PT. XYZ
Purpose – The look back evaluates the project performance of “B” Gas Plant Vessels Replacement that successful to be installed on site with plus and minus following result: • Operational Excellence / HES Compliance: no Motor Vehicle Crash (MVC), no Total Recordable Incidents (TRI), no Spill, and ze...
Saved in:
主要作者: | |
---|---|
格式: | Conference or Workshop Item |
语言: | English |
出版: |
2014
|
主题: | |
在线阅读: | http://repo.uum.edu.my/15959/1/P36.pdf http://repo.uum.edu.my/15959/ http://stmlportal.net/ictom04/TOC.html |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|