Actualizing lean construction: Barriers toward the implementation

Lean thinking has been regarded as a success strategy in mass production, realizing cost and time saving while simultaneously improving competitive position in the market.It also can be interpret as a philosophy based on the concept of lean manufacturing.It is about managing and improving the constr...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Asri, Mohammad Azwanie Naim, Mohd Nawi, Mohd Nasrun
Format: Article
Language:English
Published: AENSI Journals 2015
Subjects:
Online Access:http://repo.uum.edu.my/13879/1/Act.pdf
http://repo.uum.edu.my/13879/
http://www.aensiweb.com/AEB/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.13879
record_format eprints
spelling my.uum.repo.138792016-04-17T00:34:49Z http://repo.uum.edu.my/13879/ Actualizing lean construction: Barriers toward the implementation Mohammad Asri, Mohammad Azwanie Naim Mohd Nawi, Mohd Nasrun TH Building construction Lean thinking has been regarded as a success strategy in mass production, realizing cost and time saving while simultaneously improving competitive position in the market.It also can be interpret as a philosophy based on the concept of lean manufacturing.It is about managing and improving the construction process to profitably deliver what the customer need. Despite all the benefits that can be gained by implementing the idea of lean construction, all industry player need to consider the barriers obstructing its application.Through a review of a literature there are numbers of barrier that can be identified. The barriers toward the implementation are discussed in this paper. AENSI Journals 2015-04 Article PeerReviewed application/pdf en cc4_by http://repo.uum.edu.my/13879/1/Act.pdf Mohammad Asri, Mohammad Azwanie Naim and Mohd Nawi, Mohd Nasrun (2015) Actualizing lean construction: Barriers toward the implementation. Advances in Environmental Biology, 9 (5). pp. 172-174. ISSN 1995 - 0756 http://www.aensiweb.com/AEB/
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
Actualizing lean construction: Barriers toward the implementation
description Lean thinking has been regarded as a success strategy in mass production, realizing cost and time saving while simultaneously improving competitive position in the market.It also can be interpret as a philosophy based on the concept of lean manufacturing.It is about managing and improving the construction process to profitably deliver what the customer need. Despite all the benefits that can be gained by implementing the idea of lean construction, all industry player need to consider the barriers obstructing its application.Through a review of a literature there are numbers of barrier that can be identified. The barriers toward the implementation are discussed in this paper.
format Article
author Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
author_facet Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
author_sort Mohammad Asri, Mohammad Azwanie Naim
title Actualizing lean construction: Barriers toward the implementation
title_short Actualizing lean construction: Barriers toward the implementation
title_full Actualizing lean construction: Barriers toward the implementation
title_fullStr Actualizing lean construction: Barriers toward the implementation
title_full_unstemmed Actualizing lean construction: Barriers toward the implementation
title_sort actualizing lean construction: barriers toward the implementation
publisher AENSI Journals
publishDate 2015
url http://repo.uum.edu.my/13879/1/Act.pdf
http://repo.uum.edu.my/13879/
http://www.aensiweb.com/AEB/
_version_ 1644281307271790592
score 13.209306