Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects

The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation i...

全面介绍

Saved in:
书目详细资料
Main Authors: Mohd Nawi, Mohd Nasrun, Osman, Wan Nadzri, Che-Ani, Adi Irfan
格式: Article
语言:English
出版: AENSI Journals 2014
主题:
在线阅读:http://repo.uum.edu.my/12204/1/Key.pdf
http://repo.uum.edu.my/12204/
http://www.aensiweb.com/aeb.html
标签: 添加标签
没有标签, 成为第一个标记此记录!