Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation i...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Osman, Wan Nadzri, Che-Ani, Adi Irfan |
---|---|
Format: | Article |
Language: | English |
Published: |
AENSI Journals
2014
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/12204/1/Key.pdf http://repo.uum.edu.my/12204/ http://www.aensiweb.com/aeb.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2013) -
Improving team integration in Malaysian IBS construction projects: A partnering approach
by: Abdul Nifa, Faizatul Akmar, et al.
Published: (2012) -
Key success factors for team integration practice in Malaysian industrialised building system (IBS) construction industry
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2016) -
Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS)
by: Osman, Wan Nadzri, et al.
Published: (2015) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012)