Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects

The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation i...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Osman, Wan Nadzri, Che-Ani, Adi Irfan
Format: Article
Language:English
Published: AENSI Journals 2014
Subjects:
Online Access:http://repo.uum.edu.my/12204/1/Key.pdf
http://repo.uum.edu.my/12204/
http://www.aensiweb.com/aeb.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.12204
record_format eprints
spelling my.uum.repo.122042016-12-05T07:04:18Z http://repo.uum.edu.my/12204/ Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects Mohd Nawi, Mohd Nasrun Osman, Wan Nadzri Che-Ani, Adi Irfan TH Building construction The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation is because of lack of information and communication among stakeholders involved during the design stage of project life cycle.Accordingly, an integrated team approach was suggested by the construction lead report such as Latham Report 1994 and Egan Report 1998 which were challenge the current industry to migrate from the traditional fragmented approach towards integrated practice.In this research, will focuses on the process of identifying the key factors for the successful integrated team practice.Although the status of this research is still at the initial stage of progress however it is significantly important to be discussed for the further improvement that can be made in the future. AENSI Journals 2014-04 Article PeerReviewed application/pdf en http://repo.uum.edu.my/12204/1/Key.pdf Mohd Nawi, Mohd Nasrun and Osman, Wan Nadzri and Che-Ani, Adi Irfan (2014) Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects. Advances in Environmental Biology, 8 (5). pp. 1868-1872. ISSN 1995 - 0756 http://www.aensiweb.com/aeb.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
Che-Ani, Adi Irfan
Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
description The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation is because of lack of information and communication among stakeholders involved during the design stage of project life cycle.Accordingly, an integrated team approach was suggested by the construction lead report such as Latham Report 1994 and Egan Report 1998 which were challenge the current industry to migrate from the traditional fragmented approach towards integrated practice.In this research, will focuses on the process of identifying the key factors for the successful integrated team practice.Although the status of this research is still at the initial stage of progress however it is significantly important to be discussed for the further improvement that can be made in the future.
format Article
author Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
Che-Ani, Adi Irfan
author_facet Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
Che-Ani, Adi Irfan
author_sort Mohd Nawi, Mohd Nasrun
title Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
title_short Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
title_full Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
title_fullStr Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
title_full_unstemmed Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects
title_sort key factors for integrated project team delivery: a proposed study in ibs malaysian construction projects
publisher AENSI Journals
publishDate 2014
url http://repo.uum.edu.my/12204/1/Key.pdf
http://repo.uum.edu.my/12204/
http://www.aensiweb.com/aeb.html
_version_ 1644280849835753472
score 13.1944895