Key factors for integrated project team delivery: A proposed study in IBS Malaysian construction projects

The existence of Industrialized Building System (IBS) in Malaysian construction industry was started in 1960s. However, the participation of contractor to get involved in the IBS project is currently poor.The previous researchers have identified that one of the main barrier for IBS implementation i...

全面介紹

Saved in:
書目詳細資料
Main Authors: Mohd Nawi, Mohd Nasrun, Osman, Wan Nadzri, Che-Ani, Adi Irfan
格式: Article
語言:English
出版: AENSI Journals 2014
主題:
在線閱讀:http://repo.uum.edu.my/12204/1/Key.pdf
http://repo.uum.edu.my/12204/
http://www.aensiweb.com/aeb.html
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!