CONSTRUCTION OF MULTIPLE DESIGN AND BUILD BRIDGE PROJECTS IN SABAH
Among the various procurement methods the Design and Build (D&B) projects is significant in implementing development projects in Malaysia and other countries. When an organization undertakes multiple D&B projects involving multiple designers, contractors, subcontractors, construction manag...
Saved in:
Main Authors: | C.T, Ramanathan, Sambu Potty, Narayanan, Idrus, Arazi |
---|---|
Format: | Conference or Workshop Item |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/3982/1/WEC-CBIT007.pdf http://eprints.utp.edu.my/3982/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Component Optimisation of Multiple D&B
Bridge Projects: A Case Study in Sabah,
Malaysia
by: C.T, Ramanathan, et al.
Published: (2010) -
MANAGING RISK CONSTRAINTS OF MULTIPLE DESIGN & BUILD PROJECTS
by: Sambu Potty, Narayanan, et al.
Published: (2011) -
Component Optimisation of Multiple D&B Bridge projects: A Case Study in Sabah, Malaysia
by: C.T., Ramanathan, et al.
Published: (2009) -
MANAGEMENT OF CRITICAL SPECIALIST WORKS IN MULTIPLE BRIDGE PROJECTS: A CASE STUDY
by: Sambu Potty, Narayanan, et al.
Published: (2009) -
Sustainable Construction of Multiple D&B
Bridge Projects in Sabah
by: Ramanathan, C.T., et al.
Published: (2010)