Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement

Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By red...

Full description

Saved in:
Bibliographic Details
Main Authors: Khan, J.A., Irawan, S., Seela Thurai, A., Cai, B.
Format: Article
Published: Elsevier Ltd 2021
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05
http://eprints.utp.edu.my/23826/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.23826
record_format eprints
spelling my.utp.eprints.238262021-08-19T13:09:12Z Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement Khan, J.A. Irawan, S. Seela Thurai, A. Cai, B. Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By reducing flat time, the cost of the well can be reduced. The safe handling of the Blowout Preventer (BOP) is one of the basic operations during the flat time period to ensure control of the well during drilling. Therefore, an example case study has been conducted using 14 wells drilled in Malaysia to determine the significance of BOP flat time versus total flat time. Findings of present study clarifies that BOP flat time has a significant impact on the total flat time. Therefore, if the BOP flat time as a total time is reduced, the cost of a well will decrease considerably. Additional research was conducted to analyze BOP flat time using 32 wells drilled in Malaysia for benchmarking purposes. The times for each BOP activity were recorded and a statistical analysis was performed. Mean times for each activity were calculated and outliers were examined. The target time for nippling up (when the BOP is installed onto the wellhead) BOP is 8 h. The target time for nippling down BOP (BOP is removed from the wellhead) is 6 h. The target time to change the BOP rams is 2 h. The target time for the pressure test change out of BOP rams is 1.5 h. The target duration of the BOP pressure test is 6 h. Based on the results of the statistical analysis, the factors affecting the BOP flat time were dependent on rig procedure, rig facilities, BOP configuration, BOP pressure rating, and BOP connection type. © 2020 Elsevier Ltd Elsevier Ltd 2021 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05 Khan, J.A. and Irawan, S. and Seela Thurai, A. and Cai, B. (2021) Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement. Engineering Failure Analysis, 120 . http://eprints.utp.edu.my/23826/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By reducing flat time, the cost of the well can be reduced. The safe handling of the Blowout Preventer (BOP) is one of the basic operations during the flat time period to ensure control of the well during drilling. Therefore, an example case study has been conducted using 14 wells drilled in Malaysia to determine the significance of BOP flat time versus total flat time. Findings of present study clarifies that BOP flat time has a significant impact on the total flat time. Therefore, if the BOP flat time as a total time is reduced, the cost of a well will decrease considerably. Additional research was conducted to analyze BOP flat time using 32 wells drilled in Malaysia for benchmarking purposes. The times for each BOP activity were recorded and a statistical analysis was performed. Mean times for each activity were calculated and outliers were examined. The target time for nippling up (when the BOP is installed onto the wellhead) BOP is 8 h. The target time for nippling down BOP (BOP is removed from the wellhead) is 6 h. The target time to change the BOP rams is 2 h. The target time for the pressure test change out of BOP rams is 1.5 h. The target duration of the BOP pressure test is 6 h. Based on the results of the statistical analysis, the factors affecting the BOP flat time were dependent on rig procedure, rig facilities, BOP configuration, BOP pressure rating, and BOP connection type. © 2020 Elsevier Ltd
format Article
author Khan, J.A.
Irawan, S.
Seela Thurai, A.
Cai, B.
spellingShingle Khan, J.A.
Irawan, S.
Seela Thurai, A.
Cai, B.
Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
author_facet Khan, J.A.
Irawan, S.
Seela Thurai, A.
Cai, B.
author_sort Khan, J.A.
title Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
title_short Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
title_full Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
title_fullStr Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
title_full_unstemmed Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
title_sort quantitative analysis of blowout preventer flat time for well control operation: value added data aimed at performance enhancement
publisher Elsevier Ltd
publishDate 2021
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05
http://eprints.utp.edu.my/23826/
_version_ 1738656527246426112
score 13.211869