Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement
Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By red...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Elsevier Ltd
2021
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05 http://eprints.utp.edu.my/23826/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|