Quantitative analysis of blowout preventer flat time for well control operation: Value added data aimed at performance enhancement

Flat-time operations are essential to the well construction process in the oil and gas drilling operation. However, the technical time limit (to construct the well as fast as possible for a certain set of conditions) for a well is not always achieved, which leads to increased operating costs. By red...

Full description

Saved in:
Bibliographic Details
Main Authors: Khan, J.A., Irawan, S., Seela Thurai, A., Cai, B.
Format: Article
Published: Elsevier Ltd 2021
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096456259&doi=10.1016%2fj.engfailanal.2020.104982&partnerID=40&md5=5278ae5bba7f2322d2c078ef36aedb05
http://eprints.utp.edu.my/23826/
Tags: Add Tag
No Tags, Be the first to tag this record!