Using a developed PM in order to optimize the production productivity in a cement industry
Cement factories are highly energy and cost intensive industries. Producing the cement requires a lot of energy to transform the raw material into final product. One major area to improve the production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful li...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Published: |
JASEM ISSN 1119-8362
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf http://eprints.utp.edu.my/11667/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utp.eprints.11667 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.116672015-05-19T03:39:34Z Using a developed PM in order to optimize the production productivity in a cement industry ASSADI, M.KH TJ Mechanical engineering and machinery Cement factories are highly energy and cost intensive industries. Producing the cement requires a lot of energy to transform the raw material into final product. One major area to improve the production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of equipment, improve system reliability, decrease cost of replacement and finally improve system energy consumption. In this paper, the theory of microeconomics firm was used to find a model of optimal production productivity in cement industry. To show the effect of preventive maintenance system in the model, energy consumption of equipment is considered as a function of failure rate of equipment and then added to the set of constraints. Using this model energy consumption is reduced up to 15% and total annual cost is reduced up to 12.7%. JASEM ISSN 1119-8362 2011-06 Article PeerReviewed application/pdf http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf ASSADI, M.KH (2011) Using a developed PM in order to optimize the production productivity in a cement industry. J. Appl. Sci. Environ. Manage, 15 (2). pp. 381-389. ISSN JASEM ISSN 1119-8362 http://eprints.utp.edu.my/11667/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery ASSADI, M.KH Using a developed PM in order to optimize the production productivity in a cement industry |
description |
Cement factories are highly energy and cost intensive industries. Producing the cement
requires a lot of energy to transform the raw material into final product. One major area to improve the
production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of
equipment, improve system reliability, decrease cost of replacement and finally improve system energy
consumption.
In this paper, the theory of microeconomics firm was used to find a model of optimal production productivity
in cement industry. To show the effect of preventive maintenance system in the model, energy consumption of
equipment is considered as a function of failure rate of equipment and then added to the set of constraints.
Using this model energy consumption is reduced up to 15% and total annual cost is reduced up to 12.7%. |
format |
Article |
author |
ASSADI, M.KH |
author_facet |
ASSADI, M.KH |
author_sort |
ASSADI, M.KH |
title |
Using a developed PM in order to optimize the production productivity in a
cement industry |
title_short |
Using a developed PM in order to optimize the production productivity in a
cement industry |
title_full |
Using a developed PM in order to optimize the production productivity in a
cement industry |
title_fullStr |
Using a developed PM in order to optimize the production productivity in a
cement industry |
title_full_unstemmed |
Using a developed PM in order to optimize the production productivity in a
cement industry |
title_sort |
using a developed pm in order to optimize the production productivity in a
cement industry |
publisher |
JASEM ISSN 1119-8362 |
publishDate |
2011 |
url |
http://eprints.utp.edu.my/11667/1/13Using%20a%20developed%20PM%20in%20order%20to%20optimize%20the%20productivity%20in%20a%20cement%20Industry.pdf http://eprints.utp.edu.my/11667/ |
_version_ |
1738655973019484160 |
score |
13.214268 |