Improving Productivity in Construction projects in rural Malaysia
Productivity is an important factor contributing to the timely completion and success of a project. Productivity improvements can be made through improvements in labour productivity and through proper planning, scheduling and monitoring of activities. A study was carried out in a WS project at Telup...
Saved in:
Main Authors: | Sambu Potty, Narayanan, Mohammed Ali, Hamidon, Radzif Taharin, Mohd. |
---|---|
Format: | Conference or Workshop Item |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/11060/1/MICRA2006_hamidon.pdf http://eprints.utp.edu.my/11060/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PLANNING, SCHEDULING AND MONITORING FOR CONSTRUCTION PRODUCTIVITY IMPROVEMENT IN A RURAL WATER SUPPLY PROJECT
by: Mohd Ali, Hamidon, et al.
Published: (2006) -
Multiple Infrastructure D&B Project Management in
Rural Areas in Malaysia
by: C.T, Ramanathan, et al.
Published: (2007) -
Construction Productivity Improvement towards achieving the Malaysian Vision 2020
by: Mohd Ali, Hamidon, et al.
Published: (2008) -
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
by: C.T, Ramanathan, et al.
Published: (2008) -
TEAM BUILDING AND COORDINATION FOR DESIGN -BUILD MULTIPLE PROJECTS
by: C.T, Ramanathan, et al.
Published: (2007)