An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations

This paper proposes a two-stage planning approach for the efficient utilization of distributed generation (DG) and capacitor banks (CBs) for the simultaneous grid-connected and islanded operations of the balanced distribution networks. The first stage determines the optimal installation locations an...

Full description

Saved in:
Bibliographic Details
Main Authors: Leghari, Z. H., Hassan, M. Y., Said, D. M., Memon, Z. A., Hussain, S.
Format: Article
Published: John Wiley and Sons Ltd 2021
Subjects:
Online Access:http://eprints.utm.my/id/eprint/94738/
http://dx.doi.org/10.1002/er.6768
Tags: Add Tag
No Tags, Be the first to tag this record!