An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations

This paper proposes a two-stage planning approach for the efficient utilization of distributed generation (DG) and capacitor banks (CBs) for the simultaneous grid-connected and islanded operations of the balanced distribution networks. The first stage determines the optimal installation locations an...

Full description

Saved in:
Bibliographic Details
Main Authors: Leghari, Z. H., Hassan, M. Y., Said, D. M., Memon, Z. A., Hussain, S.
Format: Article
Published: John Wiley and Sons Ltd 2021
Subjects:
Online Access:http://eprints.utm.my/id/eprint/94738/
http://dx.doi.org/10.1002/er.6768
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.94738
record_format eprints
spelling my.utm.947382022-03-31T15:14:05Z http://eprints.utm.my/id/eprint/94738/ An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations Leghari, Z. H. Hassan, M. Y. Said, D. M. Memon, Z. A. Hussain, S. TK Electrical engineering. Electronics Nuclear engineering This paper proposes a two-stage planning approach for the efficient utilization of distributed generation (DG) and capacitor banks (CBs) for the simultaneous grid-connected and islanded operations of the balanced distribution networks. The first stage determines the optimal installation locations and capacities of DGs and CBs using an improved variant of the Jaya optimization algorithm (IJaya) to minimize the power losses and voltage deviation during the grid-connected operation of the distribution network. The second stage identifies the optimal operating point of the DG and CB combination to carry the maximum load during the islanded network operation under power supply-demand imbalance conditions. For the second stage, an analytical approach is proposed to identify the best operating power factor for the DG-CB combination, calculating the power loss, and under-utilization of the installed real-reactive power sources. Simulation results on the IEEE 33-bus grid-dependent distribution network demonstrate that the proposed IJaya significantly improved the network performance and outperforms various existing optimization methods. In addition, during the network's islanded operation, maintaining the network power factor equal to the source power factor (pfsource) makes the DG-CB combination operate at their rated capacities. John Wiley and Sons Ltd 2021 Article PeerReviewed Leghari, Z. H. and Hassan, M. Y. and Said, D. M. and Memon, Z. A. and Hussain, S. (2021) An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations. International Journal of Energy Research, 45 (10). ISSN 0363-907X http://dx.doi.org/10.1002/er.6768 DOI: 10.1002/er.6768
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Leghari, Z. H.
Hassan, M. Y.
Said, D. M.
Memon, Z. A.
Hussain, S.
An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
description This paper proposes a two-stage planning approach for the efficient utilization of distributed generation (DG) and capacitor banks (CBs) for the simultaneous grid-connected and islanded operations of the balanced distribution networks. The first stage determines the optimal installation locations and capacities of DGs and CBs using an improved variant of the Jaya optimization algorithm (IJaya) to minimize the power losses and voltage deviation during the grid-connected operation of the distribution network. The second stage identifies the optimal operating point of the DG and CB combination to carry the maximum load during the islanded network operation under power supply-demand imbalance conditions. For the second stage, an analytical approach is proposed to identify the best operating power factor for the DG-CB combination, calculating the power loss, and under-utilization of the installed real-reactive power sources. Simulation results on the IEEE 33-bus grid-dependent distribution network demonstrate that the proposed IJaya significantly improved the network performance and outperforms various existing optimization methods. In addition, during the network's islanded operation, maintaining the network power factor equal to the source power factor (pfsource) makes the DG-CB combination operate at their rated capacities.
format Article
author Leghari, Z. H.
Hassan, M. Y.
Said, D. M.
Memon, Z. A.
Hussain, S.
author_facet Leghari, Z. H.
Hassan, M. Y.
Said, D. M.
Memon, Z. A.
Hussain, S.
author_sort Leghari, Z. H.
title An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
title_short An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
title_full An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
title_fullStr An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
title_full_unstemmed An efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
title_sort efficient framework for integrating distributed generation and capacitor units for simultaneous grid-connected and islanded network operations
publisher John Wiley and Sons Ltd
publishDate 2021
url http://eprints.utm.my/id/eprint/94738/
http://dx.doi.org/10.1002/er.6768
_version_ 1729703214441299968
score 13.160551