Completing abandoned public facility projects by the private sector: results of a Delphi survey in the Iranian water and wastewater company
Purpose: Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only be solved with the help of the private sector. Therefore, this study aims to investigate the capacity of the pri...
Saved in:
Main Authors: | Sarvari, Hadi, Cristofaro, Matteo, Chan, Daniel W. M., Md. Noor, Norhazilan, Amini, Mohammadreza |
---|---|
Format: | Article |
Published: |
Emerald Group Holdings Ltd.
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/90804/ http://dx.doi.org/10.1108/JFM-07-2020-0046 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk ranking of Malaysian public private partnership projects
by: Md. Noor, Norhazilan, et al.
Published: (2014) -
Problem facing by private developer involving abandoned projects in Malaysia
by: Muhamad Abdul Hadi, Ahmad Sabri
Published: (2019) -
Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran
by: Sarvari, Hadi, et al.
Published: (2021) -
A global survey of infection control and mitigation measures for combating the transmission of COVID-19 pandemic in buildings under facilities management services
by: Hadi Sarvari, Hadi Sarvari, et al.
Published: (2022) -
A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study
by: Valipour, Alireza, et al.
Published: (2015)