A review of work breakdown structure and man-hours estimation method used in shipbuilding production
The aim of this research is to define the Work Breakdown Structure (WBS) and to understand the linkages between WBS and man-hours development for Shipbuilding Project. The Work Breakdown Structure (WBS) is the best tool to simplify the complexity of the project and this research will define the comp...
Saved in:
Main Authors: | Rahman, W. A. Z. W. A., Zaki, N. I. M., Husain, M. K. A. |
---|---|
Format: | Article |
Published: |
IAEME Publication
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/88861/ https://www-scopus-com.ezproxy.utm.my/record/display.uri?eid=2-s2.0-85060945191&origin=resultslist&sort=plf-f&src=s&st1= |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Work breakdown structure application for man-hours calculation in hull construction shipbuilding in Malaysia
by: Wan Abd Rahman, W. A. Z., et al.
Published: (2019) -
Productivity measurement in Malaysia shipbuilding industry
by: Roslee, Ahmad Azmeer
Published: (2009) -
Viability study on the application of advance blasting method in Malaysian shipbuilding industry
by: Md. Naiem, Mohd. Azzeri
Published: (2004) -
Structure and breakdown properties of polypropylene-based nanocomposites
by: Azmi, A., et al.
Published: (2021) -
THE COMPETITIVENESS OF SHIPBUILDING INDUSTRY IN SCOPE OF SHIPBUILDING PROCESS : A CASE STUDY IN GRADE ONE MARINE SHIPYARD SDN BHD PERAK
by: NOR MAIZATUL ADILLIA BINTI ADIL
Published: (2015)