Interpretation of contracts : admissibility of pre-contractual negotiations
Differing interpretation of contract requirements is among key causes of construction contractual disputes. Generally interpretation of a contract is confined to the four corners of the document. In reality, commercial contracts do not artificially live in isolation from context, and courts have alr...
Saved in:
Main Author: | Mohamad Khairuddi, Muhammad Khawarizmi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/86054/1/MuhammadKhawarizmiMohamadMFABU2019.pdf http://eprints.utm.my/id/eprint/86054/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131438 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Smart contract in Malaysia Construction Industry
by: Mohamad Hidhir, Syarafina Adizah
Published: (2021) -
The profile of breaches of contract in construction industry
by: Zainudin, Farah Liyana
Published: (2019) -
Profiling of termination grounds in construction contract
by: Liew, Sock Tin
Published: (2018) -
Validity issues of variation order in construction contracts
by: Mazahar, Norazilan
Published: (2019) -
Contract administrator’s liability for pure economic loss
by: Abdul Rahman, Atikah
Published: (2017)