Assessment of cost escalation factors for building and civil engineering projects in Nigerian construction industry: A multiple regression approach
Estimation of cost for building and civil engineering projects with minimum error at the conceptual stage of project development is crucial for planning. This paper evaluated the most significant cost escalation causing factors in building and civil engineering projects. Questionnaires were administ...
Saved in:
Main Authors: | Muhammad, N. Z., Keyvanfar, A., Majid, M. Z. A., Shafaghat, A., Magana, A. M., Lawan, H., Balubaid, S. |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press
2015
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/57904/1/AliKeyvanfar2015_AssessmentofCostEscalationFactors.pdf http://eprints.utm.my/id/eprint/57904/ http://dx.doi.org/ 10.11113/jt.v74.4614 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Causes of variation order in building and civil engineering projectsin Nigeria
by: Muhammad, Nasiru Zakari, et al.
Published: (2015) -
Kuin's troubles escalate
by: Embun, Majid
Published: (2013) -
Numerical investigation of the effect of weather conditions on the escalation and propagation of fire-induced domino effect
by: Malik, A.A., et al.
Published: (2021) -
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
by: C.T, Ramanathan, et al.
Published: (2014) -
Function development for appraising brittleness of intact rocks using genetic programming and non-linear multiple regression models
by: Khandelwal, M., et al.
Published: (2017)