Evaluation of pharmaceutical cream production debottlenecking schemes
The main objective of this work is to model and debottleneck a pharmaceutical production of an anti-allergic cream. The base case process has a minimum cycle time of 29 hours which is equivalent to 66 batches/year. Four schemes were proposed for process debottlenecking due to the anticipated increas...
Saved in:
Main Authors: | Tan, Jully, Foo, Dominic Chwan Yee, Kumaresan, Sivakumar, Abdul Aziz, Ramlan |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/5366/1/JullyTan2005_EvaluationOfPharmaceuticalCreamProduction.pdf http://eprints.utm.my/id/eprint/5366/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Computer-aided process design tools for debottlenecking a batch pharmaceutical production
by: Jully, Tan, et al.
Published: (2008) -
Computer-aided process design tools for debottlenecking a batch pharmaceutical production
by: Tan, Jully, et al.
Published: (2011) -
Evaluation of pharmaceutical production expansion plan via batch process simulation
by: Tan, Jully, et al.
Published: (2011) -
Debottleneck strategy and economic analysis of β-glucuronidase enzyme production
by: Mel, Maizirwan, et al.
Published: (2011) -
Process modelling and debottlenecking study of a vaccine production
by: Mohamed Safri, Nurul Huda, et al.
Published: (2012)