Evaluation of pharmaceutical cream production debottlenecking schemes
The main objective of this work is to model and debottleneck a pharmaceutical production of an anti-allergic cream. The base case process has a minimum cycle time of 29 hours which is equivalent to 66 batches/year. Four schemes were proposed for process debottlenecking due to the anticipated increas...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/5366/1/JullyTan2005_EvaluationOfPharmaceuticalCreamProduction.pdf http://eprints.utm.my/id/eprint/5366/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.5366 |
---|---|
record_format |
eprints |
spelling |
my.utm.53662010-06-01T15:29:45Z http://eprints.utm.my/id/eprint/5366/ Evaluation of pharmaceutical cream production debottlenecking schemes Tan, Jully Foo, Dominic Chwan Yee Kumaresan, Sivakumar Abdul Aziz, Ramlan T Technology (General) The main objective of this work is to model and debottleneck a pharmaceutical production of an anti-allergic cream. The base case process has a minimum cycle time of 29 hours which is equivalent to 66 batches/year. Four schemes were proposed for process debottlenecking due to the anticipated increase of the product demand of 150% in the market. By carrying out throughput analysis study, schemes that fulfil the debottlenecking objective were determined. Out of the four debottlenecking schemes, Scheme 4 was chosen, which proposed a new blending tank and intermediate tank, showed a production increase of over 150%. 2005 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/5366/1/JullyTan2005_EvaluationOfPharmaceuticalCreamProduction.pdf Tan, Jully and Foo, Dominic Chwan Yee and Kumaresan, Sivakumar and Abdul Aziz, Ramlan (2005) Evaluation of pharmaceutical cream production debottlenecking schemes. In: International Symposium On Design, Operation and Control Of Chemical Processes 2005, 13-15 August 2005, Seoul, Korea. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Tan, Jully Foo, Dominic Chwan Yee Kumaresan, Sivakumar Abdul Aziz, Ramlan Evaluation of pharmaceutical cream production debottlenecking schemes |
description |
The main objective of this work is to model and debottleneck a pharmaceutical production of an anti-allergic cream. The base case process has a minimum cycle time of 29 hours which is equivalent to 66 batches/year. Four schemes were proposed for process debottlenecking due to the anticipated increase of the product demand of 150% in the market. By carrying out throughput analysis study, schemes that fulfil the debottlenecking objective were determined. Out of the four debottlenecking schemes, Scheme 4 was chosen, which proposed a new blending tank and intermediate tank, showed a production increase of over 150%. |
format |
Conference or Workshop Item |
author |
Tan, Jully Foo, Dominic Chwan Yee Kumaresan, Sivakumar Abdul Aziz, Ramlan |
author_facet |
Tan, Jully Foo, Dominic Chwan Yee Kumaresan, Sivakumar Abdul Aziz, Ramlan |
author_sort |
Tan, Jully |
title |
Evaluation of pharmaceutical cream production debottlenecking schemes |
title_short |
Evaluation of pharmaceutical cream production debottlenecking schemes |
title_full |
Evaluation of pharmaceutical cream production debottlenecking schemes |
title_fullStr |
Evaluation of pharmaceutical cream production debottlenecking schemes |
title_full_unstemmed |
Evaluation of pharmaceutical cream production debottlenecking schemes |
title_sort |
evaluation of pharmaceutical cream production debottlenecking schemes |
publishDate |
2005 |
url |
http://eprints.utm.my/id/eprint/5366/1/JullyTan2005_EvaluationOfPharmaceuticalCreamProduction.pdf http://eprints.utm.my/id/eprint/5366/ |
_version_ |
1643644305000103936 |
score |
13.188404 |