Building information modeling in planning and scheduling phase in Iran

Building Information Modeling (BIM) is a digital representation of the building process to facilitate exchange and interoperability of information in digital format. In this way, the implementation of BIM in construction practice promises to improve the communication and collaboration between partic...

Full description

Saved in:
Bibliographic Details
Main Author: Ghomi, Saeid Khalili
Format: Thesis
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/42076/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:78890
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.42076
record_format eprints
spelling my.utm.420762020-08-04T04:35:53Z http://eprints.utm.my/id/eprint/42076/ Building information modeling in planning and scheduling phase in Iran Ghomi, Saeid Khalili TH Building construction Building Information Modeling (BIM) is a digital representation of the building process to facilitate exchange and interoperability of information in digital format. In this way, the implementation of BIM in construction practice promises to improve the communication and collaboration between participants through higher interoperability of data. However, to implement BIM on a construction project, practitioners need to configure and align BIM based tools, project work processes, and the business models of the companies that work together on a project. In this study the main advantages of using new methods in the field of construction management were identified. Identification of the benefits of using BIM based scheduling and planning and the ways of enhancing this method in Iran in comparison with conventional based methods was one of the goals. On the other hand, finding the barriers and difficulties of implementing of BIM based scheduling and planning Iran was one of the objectives. Finally effective and enhancement strategies for BIM implementation in the construction industry in Iran were identified. The scope of the project is limited to the construction phase within Iran. For conducting this study all the data were collected from literature review, case study and questionnaire together moreover the retrieved questionnaires were then compiled and analysed with the frequencies are represented in the form of tables and charts. In order to generate the results, of Statistics for Social Science (SPSS software) and also the average index computation were used. The case study of this project was a training building which all the BIM data from design phase and Microsoft project imported to Autodesk Navisworks for making a 4D construction. In this study the benefits of using 4D planning and scheduling and major differences between conventional and 4D planning and scheduling were determined. On the other hand the main barriers of implementation of BIM based planning and scheduling and major strategies to implement this new method within IRAN were identified. 2013 Thesis NonPeerReviewed Ghomi, Saeid Khalili (2013) Building information modeling in planning and scheduling phase in Iran. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:78890
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TH Building construction
spellingShingle TH Building construction
Ghomi, Saeid Khalili
Building information modeling in planning and scheduling phase in Iran
description Building Information Modeling (BIM) is a digital representation of the building process to facilitate exchange and interoperability of information in digital format. In this way, the implementation of BIM in construction practice promises to improve the communication and collaboration between participants through higher interoperability of data. However, to implement BIM on a construction project, practitioners need to configure and align BIM based tools, project work processes, and the business models of the companies that work together on a project. In this study the main advantages of using new methods in the field of construction management were identified. Identification of the benefits of using BIM based scheduling and planning and the ways of enhancing this method in Iran in comparison with conventional based methods was one of the goals. On the other hand, finding the barriers and difficulties of implementing of BIM based scheduling and planning Iran was one of the objectives. Finally effective and enhancement strategies for BIM implementation in the construction industry in Iran were identified. The scope of the project is limited to the construction phase within Iran. For conducting this study all the data were collected from literature review, case study and questionnaire together moreover the retrieved questionnaires were then compiled and analysed with the frequencies are represented in the form of tables and charts. In order to generate the results, of Statistics for Social Science (SPSS software) and also the average index computation were used. The case study of this project was a training building which all the BIM data from design phase and Microsoft project imported to Autodesk Navisworks for making a 4D construction. In this study the benefits of using 4D planning and scheduling and major differences between conventional and 4D planning and scheduling were determined. On the other hand the main barriers of implementation of BIM based planning and scheduling and major strategies to implement this new method within IRAN were identified.
format Thesis
author Ghomi, Saeid Khalili
author_facet Ghomi, Saeid Khalili
author_sort Ghomi, Saeid Khalili
title Building information modeling in planning and scheduling phase in Iran
title_short Building information modeling in planning and scheduling phase in Iran
title_full Building information modeling in planning and scheduling phase in Iran
title_fullStr Building information modeling in planning and scheduling phase in Iran
title_full_unstemmed Building information modeling in planning and scheduling phase in Iran
title_sort building information modeling in planning and scheduling phase in iran
publishDate 2013
url http://eprints.utm.my/id/eprint/42076/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:78890
_version_ 1675327323687092224
score 13.160551