Budget allocation management model for seismic rehabilitation of infrastructure assets
Economic efficiency is an important factor in seismic rehabilitation planning for infrastructure assets. An inventory of structures is screened to identify seismically susceptible parts and prioritize them in the order of need for rehabilitation purposes. In most cases, the financial resources for r...
Saved in:
Main Author: | Yadollahi, Mohammadreza |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/37797/5/MohammadrezaYadollahiPFKA2013.pdf http://eprints.utm.my/id/eprint/37797/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Applied multi-criteria ideal rehabilitation model for budget allocation across road infrastructure
by: Yadollahi, Mohammadreza, et al.
Published: (2011) -
Information management to integrate cost and schedule for infrastructure projects
by: Chung , Keat Wei
Published: (2004) -
Abandoned housing projects in Malaysia: Risk management capabilities during rehabilitation
by: Abdul-Rahman, H., et al.
Published: (2016) -
Seismic design for reinforced concrete office building influenced by concrete grade and level of seismicity
by: Azlina, Nordin
Published: (2019) -
Abandoned housing project during the rehabilitation process
by: Eng, Shwu Mei, et al.
Published: (2013)