Budget allocation management model for seismic rehabilitation of infrastructure assets

Economic efficiency is an important factor in seismic rehabilitation planning for infrastructure assets. An inventory of structures is screened to identify seismically susceptible parts and prioritize them in the order of need for rehabilitation purposes. In most cases, the financial resources for r...

Full description

Saved in:
Bibliographic Details
Main Author: Yadollahi, Mohammadreza
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/37797/5/MohammadrezaYadollahiPFKA2013.pdf
http://eprints.utm.my/id/eprint/37797/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.37797
record_format eprints
spelling my.utm.377972017-07-24T01:33:26Z http://eprints.utm.my/id/eprint/37797/ Budget allocation management model for seismic rehabilitation of infrastructure assets Yadollahi, Mohammadreza TH Building construction Economic efficiency is an important factor in seismic rehabilitation planning for infrastructure assets. An inventory of structures is screened to identify seismically susceptible parts and prioritize them in the order of need for rehabilitation purposes. In most cases, the financial resources for rehabilitation of infrastructure assets are limited. Therefore, there is a need to efficiently allocate such resources to various projects. The main goal of this research is to develop a budget allocation management model for rehabilitation of infrastructure projects, when there isn’t sufficient budget to allocate to all projects. Accordingly, a decision support system is developed and exercised in this research to optimize the budget for rehabilitation projects in three categories of road structures. To accomplish this, a computer-based Multiple Strategy Budget Allocation decision support System (MSBAS©) was developed to identify (including selection and prioritization) the best configuration (package) of seismic rehabilitation projects across existing structures. This system employs a multi-criteria assessment module that takes into account desirable criteria to estimate the financial needs for rehabilitation based on the existing budget constraints in a fiscal year. To select the optimal package of projects, a Genetic Algorithm (GA) optimization module is also developed. Multi-objective decision making is conducted under a specific decision strategy with solving a 0-1 Knapsack Problem. To demonstrate the applicability of the GA-based approach, a hypothetical decision making problem is presented. Using this system, managers can compare their decisions for different strategies and significantly improve management efficiency. 2013-02 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/37797/5/MohammadrezaYadollahiPFKA2013.pdf Yadollahi, Mohammadreza (2013) Budget allocation management model for seismic rehabilitation of infrastructure assets. PhD thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Yadollahi, Mohammadreza
Budget allocation management model for seismic rehabilitation of infrastructure assets
description Economic efficiency is an important factor in seismic rehabilitation planning for infrastructure assets. An inventory of structures is screened to identify seismically susceptible parts and prioritize them in the order of need for rehabilitation purposes. In most cases, the financial resources for rehabilitation of infrastructure assets are limited. Therefore, there is a need to efficiently allocate such resources to various projects. The main goal of this research is to develop a budget allocation management model for rehabilitation of infrastructure projects, when there isn’t sufficient budget to allocate to all projects. Accordingly, a decision support system is developed and exercised in this research to optimize the budget for rehabilitation projects in three categories of road structures. To accomplish this, a computer-based Multiple Strategy Budget Allocation decision support System (MSBAS©) was developed to identify (including selection and prioritization) the best configuration (package) of seismic rehabilitation projects across existing structures. This system employs a multi-criteria assessment module that takes into account desirable criteria to estimate the financial needs for rehabilitation based on the existing budget constraints in a fiscal year. To select the optimal package of projects, a Genetic Algorithm (GA) optimization module is also developed. Multi-objective decision making is conducted under a specific decision strategy with solving a 0-1 Knapsack Problem. To demonstrate the applicability of the GA-based approach, a hypothetical decision making problem is presented. Using this system, managers can compare their decisions for different strategies and significantly improve management efficiency.
format Thesis
author Yadollahi, Mohammadreza
author_facet Yadollahi, Mohammadreza
author_sort Yadollahi, Mohammadreza
title Budget allocation management model for seismic rehabilitation of infrastructure assets
title_short Budget allocation management model for seismic rehabilitation of infrastructure assets
title_full Budget allocation management model for seismic rehabilitation of infrastructure assets
title_fullStr Budget allocation management model for seismic rehabilitation of infrastructure assets
title_full_unstemmed Budget allocation management model for seismic rehabilitation of infrastructure assets
title_sort budget allocation management model for seismic rehabilitation of infrastructure assets
publishDate 2013
url http://eprints.utm.my/id/eprint/37797/5/MohammadrezaYadollahiPFKA2013.pdf
http://eprints.utm.my/id/eprint/37797/
_version_ 1643650161289723904
score 13.211869