A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
The objective of the survey which was conducted in the Klang Valley of Malaysia was to prioritise factors that are considered by building contractors in estimating the construction cost of buildings. Respondents selected by simple random sampling have been asked to assign a one-to-five rating for ea...
Saved in:
Main Authors: | Toh, Tien Choon, Lim, Cheng Sim, Ting, Connie, Ali, Kherun Nita, Aliagha, Godwin Uche, Goh, Kai Chen |
---|---|
Format: | Conference or Workshop Item |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/37147/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Preliminary building information modelling adoption model in Malaysia A strategic information technology perspective
by: Enegbuma, Wallace Imoudu, et al.
Published: (2014) -
Preliminary study impact of building information modelling use in Malaysia
by: Enegbuma, Wallace Imoudu, et al.
Published: (2014) -
The influence of transformational leadership style on ICT adoption in the Nigerian construction industry
by: Waziri, Abdullahi Y., et al.
Published: (2015) -
A review of potential areas of construction cost estimating and identification of research gaps
by: Toh, Tien Choon, et al.
Published: (2008) -
Influence of organizational leadership on knowledge transfer in construction
by: Idris, Katun M., et al.
Published: (2015)