A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia

The objective of the survey which was conducted in the Klang Valley of Malaysia was to prioritise factors that are considered by building contractors in estimating the construction cost of buildings. Respondents selected by simple random sampling have been asked to assign a one-to-five rating for ea...

Full description

Saved in:
Bibliographic Details
Main Authors: Toh, Tien Choon, Lim, Cheng Sim, Ting, Connie, Ali, Kherun Nita, Aliagha, Godwin Uche, Goh, Kai Chen
Format: Conference or Workshop Item
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/37147/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.37147
record_format eprints
spelling my.utm.371472017-09-27T06:49:20Z http://eprints.utm.my/id/eprint/37147/ A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia Toh, Tien Choon Lim, Cheng Sim Ting, Connie Ali, Kherun Nita Aliagha, Godwin Uche Goh, Kai Chen H Social Sciences The objective of the survey which was conducted in the Klang Valley of Malaysia was to prioritise factors that are considered by building contractors in estimating the construction cost of buildings. Respondents selected by simple random sampling have been asked to assign a one-to-five rating for each of the total of 79 cost factors identified from the literature review. The result of the preliminary survey of factors influencing project cost estimating practice of building contractors has indicated that only 35 cost factors have been regarded by the respondents from small, medium and large building construction companies as highly relevant for building construction projects. 'Client requirements on quality' was found to be the most significant cost factor influencing the construction cost of buildings. 2013 Conference or Workshop Item PeerReviewed Toh, Tien Choon and Lim, Cheng Sim and Ting, Connie and Ali, Kherun Nita and Aliagha, Godwin Uche and Goh, Kai Chen (2013) A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia. In: The 2nd International Conference on Mechanical Engineering, Materials Science and Civil Engineering (ICMEMSCE2013), 2013.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic H Social Sciences
spellingShingle H Social Sciences
Toh, Tien Choon
Lim, Cheng Sim
Ting, Connie
Ali, Kherun Nita
Aliagha, Godwin Uche
Goh, Kai Chen
A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
description The objective of the survey which was conducted in the Klang Valley of Malaysia was to prioritise factors that are considered by building contractors in estimating the construction cost of buildings. Respondents selected by simple random sampling have been asked to assign a one-to-five rating for each of the total of 79 cost factors identified from the literature review. The result of the preliminary survey of factors influencing project cost estimating practice of building contractors has indicated that only 35 cost factors have been regarded by the respondents from small, medium and large building construction companies as highly relevant for building construction projects. 'Client requirements on quality' was found to be the most significant cost factor influencing the construction cost of buildings.
format Conference or Workshop Item
author Toh, Tien Choon
Lim, Cheng Sim
Ting, Connie
Ali, Kherun Nita
Aliagha, Godwin Uche
Goh, Kai Chen
author_facet Toh, Tien Choon
Lim, Cheng Sim
Ting, Connie
Ali, Kherun Nita
Aliagha, Godwin Uche
Goh, Kai Chen
author_sort Toh, Tien Choon
title A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
title_short A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
title_full A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
title_fullStr A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
title_full_unstemmed A preliminary survey of factors influencing project cost estimating practice in the Klang Valley of Malaysia
title_sort preliminary survey of factors influencing project cost estimating practice in the klang valley of malaysia
publishDate 2013
url http://eprints.utm.my/id/eprint/37147/
_version_ 1643650090738384896
score 13.160551