Profile of set-off cases in Malaysian construction industry
The problem of non-payment has long been lamented by the construction industry players. Payment default, as many in the industry know, poses potential undesirable consequences such as stifling the cash flow of industry participants, resulting in their insolvency, and affecting the entire project del...
Saved in:
Main Author: | Loo, Shih Nie @ Nancy Loo |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/36555/1/LooShihNieNancyMFAB2012.pdf http://eprints.utm.my/id/eprint/36555/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:69762?site_name=Restricted Repository |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The profile of construction delay cases
by: Loo, Jenny Shih Yein
Published: (2012) -
Employer's right of set-off in construction contracts
by: Chin, Kean Voon
Published: (2010) -
Profiling of extension of time cases in Malaysian construction projects
by: Abdul Latif, Abdul Hafiz
Published: (2022) -
Profiling of summary judgement in construction industry
by: Thangathulai, Christie
Published: (2019) -
Profiling of valid available grounds to claim extension of time in construction industry
by: Lam, Tian Sui
Published: (2020)