Draft, trim and heel control for LNG ship with hybrid ballast free system
A hybrid ballast free system is proposed on a selected LNG vessel. The particulars of the vessel are LBP 266.0 m, beam 41.63 m and depth 3.91 m. The additional system is coupled to the existing conventional ballast system. The hybrid system requires the introduction of longitudinal tunnels on each s...
Saved in:
Main Author: | |
---|---|
Format: | Conference or Workshop Item |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/34456/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.34456 |
---|---|
record_format |
eprints |
spelling |
my.utm.344562017-09-07T01:13:22Z http://eprints.utm.my/id/eprint/34456/ Draft, trim and heel control for LNG ship with hybrid ballast free system Ahmad, Mohd. Zamani TJ Mechanical engineering and machinery A hybrid ballast free system is proposed on a selected LNG vessel. The particulars of the vessel are LBP 266.0 m, beam 41.63 m and depth 3.91 m. The additional system is coupled to the existing conventional ballast system. The hybrid system requires the introduction of longitudinal tunnels on each side of the vessel centre line in the double bottom. The tunnels occupy the full height of the double bottom, thus maintaining the LNG ship cargo space. 2012 Conference or Workshop Item PeerReviewed Ahmad, Mohd. Zamani (2012) Draft, trim and heel control for LNG ship with hybrid ballast free system. In: Conference, 2012. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Ahmad, Mohd. Zamani Draft, trim and heel control for LNG ship with hybrid ballast free system |
description |
A hybrid ballast free system is proposed on a selected LNG vessel. The particulars of the vessel are LBP 266.0 m, beam 41.63 m and depth 3.91 m. The additional system is coupled to the existing conventional ballast system. The hybrid system requires the introduction of longitudinal tunnels on each side of the vessel centre line in the double bottom. The tunnels occupy the full height of the double bottom, thus maintaining the LNG ship cargo space. |
format |
Conference or Workshop Item |
author |
Ahmad, Mohd. Zamani |
author_facet |
Ahmad, Mohd. Zamani |
author_sort |
Ahmad, Mohd. Zamani |
title |
Draft, trim and heel control for LNG ship with hybrid ballast free system |
title_short |
Draft, trim and heel control for LNG ship with hybrid ballast free system |
title_full |
Draft, trim and heel control for LNG ship with hybrid ballast free system |
title_fullStr |
Draft, trim and heel control for LNG ship with hybrid ballast free system |
title_full_unstemmed |
Draft, trim and heel control for LNG ship with hybrid ballast free system |
title_sort |
draft, trim and heel control for lng ship with hybrid ballast free system |
publishDate |
2012 |
url |
http://eprints.utm.my/id/eprint/34456/ |
_version_ |
1643649585474699264 |
score |
13.188404 |