Implementation guidelines of the walk-through and questionnaire techniques in the usability testing of the scrum method
A wrongly chosen software development method often leads to the increased development cost or possible failure of a project. Therefore, a software development method should be systematically evaluated in order to measure its suitability for a particular type of project settings. Recently, there is a...
Saved in:
Main Authors: | Muhammad, A. Khairuddin, Wan Kadir, Wan Mohd. Nasir |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/3056/1/Muhammad_Asyraf_Khairuddin.doc http://eprints.utm.my/id/eprint/3056/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implementation guidelines for using walk-through and questionnaire techniques in evaluating the scrum method
by: Khairuddin, Muhammad Asyraf
Published: (2006) -
A risk poker based testing model for scrum
by: Ghazali, Siti Noor Hasanah, et al.
Published: (2018) -
Using pre-test to validate the Questionnaire for Website Usability (QWU)
by: Nur Sukinah, Aziz, et al.
Published: (2015) -
New usability guidelines with implementation ways of mobile learning application based on mobile learning usability attributes
by: Hujainah, Fadhl, et al.
Published: (2016) -
Usability guidelines of mobile learning application
by: Hujainah, Fadhl, et al.
Published: (2013)