Perlaksanaan pengurusan berkesan projek Sistem Binaan Berindustri (IBS) di Jabatan Kerja Raya (JKR)
Saved in:
Main Author: | Hatta @ Antah, Fazilah |
---|---|
Format: | Thesis |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/26112/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Persepsi kontraktor terhadap sistem binaan berindustri (IBS) kes kajian : kontraktor Negeri Kedah
by: Mat Isa, Norhafiza
Published: (2010) -
Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
by: Omar, Nur Shahirah
Published: (2010) -
Faktor penggunaan sistem binaan berindustri (IBS) di Malaysia
by: Che Ngah, Mohd Syafiq, et al.
Published: (2013) -
Sistem Binaan Berindustri
by: Norlia, Mohamad Ibrahim, et al.
Published: (2017) -
Teknik SIM - BOOST untuk mengukur produktiviti buruh di tapak bina bagi sistem binaan berindustri
by: Hanafi, Mohd. Hanizun
Published: (2008)