Pembinaan konstruk instrumen penilaian pasca penghunian untuk perumahan bertingkat yang dibina menggunakan kaedah Sistem Binaan Berindustri (IBS)
Post Occupancy Evaluation (POE) is an activity of the building evaluation process with a focus on quality, operational performance and satisfaction of the occupants. The POE is important to evaluate completed and occupied buildings to identify weaknesses and potential for future improvement. To date...
保存先:
主要な著者: | , , , |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
2021
|
主題: | |
オンライン・アクセス: | http://eprints.uthm.edu.my/1756/1/J12112_0af41dabaa82c4a20f6214dc212ad88a.pdf http://eprints.uthm.edu.my/1756/ https://doi.org/10.11113/jurnalteknologi.v83.15081 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|