Simulation of tasks in bridge construction
Saved in:
Main Author: | Mohammed Mohammed, Basheer Abdul Wareth |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18536/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Structural performance evaluation of a precast PSC curved girder bridge constructed using multi-tasking formwork
by: Kim, S. J., et al.
Published: (2016) -
Buildability in bridge construction : case study of Sungai Johor cable-stayed bridge
by: Zahidi, Mardiyah
Published: (2009) -
Cable stayed bridge construction : case study of Sungai Johor cable stayed bridge
by: Lee, Foo Wei
Published: (2009) -
CONSTRUCTION OF MULTIPLE DESIGN AND BUILD BRIDGE PROJECTS
IN SABAH
by: C.T, Ramanathan, et al.
Published: (2010) -
The potential utilization of ultra-high performance concrete for bridge construction in Malaysia
by: Kasim, Norhidayu, et al.
Published: (2019)