Application of 5D BIM to improve the oil and gas project cost performance.
The aim of this article is to highlight the benefits of implementing 5D BIM for controlling and managing project costs to ensure that the project is completed on time and on budget. Additionally, crucial success criteria will be highlighted, as well as a recommended implementation roadmap. 5D BIM en...
Saved in:
Main Authors: | Ahmad, Azura, Sarip, Shamsul, Fathi, Mohamad Syazli, Abd. Fatah, Abd. Yasser |
---|---|
Format: | Conference or Workshop Item |
Published: |
2023
|
Subjects: | |
Online Access: | http://eprints.utm.my/107368/ http://dx.doi.org/10.1063/5.0164502 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Building Information Modelling (BIM) implementation for highway project from consultant’s perspectives in Malaysia
by: Halim, E., et al.
Published: (2022) -
Contractual challenges for BIM-based construction projects: a systematic review
by: Abd. Jamil, Ahmad Huzaimi, et al.
Published: (2018) -
Adaptation 4D and 5D BIM for BIM/GIS data integration in construction project management
by: Wan Abdul Basir, Wan Nor Fa’aizah, et al.
Published: (2023) -
Framework for Safety Control for Maintenance of Infrastructure Oil and Gas Project Using BIM
by: Mazli, Nur Syirin Syifaa
Published: (2022) -
An overview of contract documents for building information modelling (BIM) construction projects
by: Abd. Jamil, Ahmad Huzaimi, et al.
Published: (2017)