Application of 5D BIM to improve the oil and gas project cost performance.

The aim of this article is to highlight the benefits of implementing 5D BIM for controlling and managing project costs to ensure that the project is completed on time and on budget. Additionally, crucial success criteria will be highlighted, as well as a recommended implementation roadmap. 5D BIM en...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Azura, Sarip, Shamsul, Fathi, Mohamad Syazli, Abd. Fatah, Abd. Yasser
Format: Conference or Workshop Item
Published: 2023
Subjects:
Online Access:http://eprints.utm.my/107368/
http://dx.doi.org/10.1063/5.0164502
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.107368
record_format eprints
spelling my.utm.1073682024-09-03T06:29:31Z http://eprints.utm.my/107368/ Application of 5D BIM to improve the oil and gas project cost performance. Ahmad, Azura Sarip, Shamsul Fathi, Mohamad Syazli Abd. Fatah, Abd. Yasser TA Engineering (General). Civil engineering (General) The aim of this article is to highlight the benefits of implementing 5D BIM for controlling and managing project costs to ensure that the project is completed on time and on budget. Additionally, crucial success criteria will be highlighted, as well as a recommended implementation roadmap. 5D BIM enables cost overruns to be avoided and the cost monitoring and control function to be improved. Similarly, 5D BIM is dependent on the availability and accuracy of data. Cleansing and preparing the data for usage in the simulation model is required. Adopting an effective implementation roadmap will produce an accurate and reliable cost performance report. The project team will alert the client of cost discrepancies in advance. 2023-09-12 Conference or Workshop Item PeerReviewed Ahmad, Azura and Sarip, Shamsul and Fathi, Mohamad Syazli and Abd. Fatah, Abd. Yasser (2023) Application of 5D BIM to improve the oil and gas project cost performance. In: 11th International Conference on Applied Science and Technology 2022, ICAST 2022, 13 June 2022 - 14 June 2022, Hybrid, Putrajaya, Malaysia. http://dx.doi.org/10.1063/5.0164502
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Ahmad, Azura
Sarip, Shamsul
Fathi, Mohamad Syazli
Abd. Fatah, Abd. Yasser
Application of 5D BIM to improve the oil and gas project cost performance.
description The aim of this article is to highlight the benefits of implementing 5D BIM for controlling and managing project costs to ensure that the project is completed on time and on budget. Additionally, crucial success criteria will be highlighted, as well as a recommended implementation roadmap. 5D BIM enables cost overruns to be avoided and the cost monitoring and control function to be improved. Similarly, 5D BIM is dependent on the availability and accuracy of data. Cleansing and preparing the data for usage in the simulation model is required. Adopting an effective implementation roadmap will produce an accurate and reliable cost performance report. The project team will alert the client of cost discrepancies in advance.
format Conference or Workshop Item
author Ahmad, Azura
Sarip, Shamsul
Fathi, Mohamad Syazli
Abd. Fatah, Abd. Yasser
author_facet Ahmad, Azura
Sarip, Shamsul
Fathi, Mohamad Syazli
Abd. Fatah, Abd. Yasser
author_sort Ahmad, Azura
title Application of 5D BIM to improve the oil and gas project cost performance.
title_short Application of 5D BIM to improve the oil and gas project cost performance.
title_full Application of 5D BIM to improve the oil and gas project cost performance.
title_fullStr Application of 5D BIM to improve the oil and gas project cost performance.
title_full_unstemmed Application of 5D BIM to improve the oil and gas project cost performance.
title_sort application of 5d bim to improve the oil and gas project cost performance.
publishDate 2023
url http://eprints.utm.my/107368/
http://dx.doi.org/10.1063/5.0164502
_version_ 1811681170292736000
score 13.2014675