Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
This project investigates the possibility of developing scheduling heuristic using bottleneck approach for a three machine flow shop scheduling with the tendency of dominant machine at the first process. Due to the re-entrant and permutation nature of the process routing, the actual bottlenecks were...
Saved in:
Main Authors: | Md Amin Hamzas, Mohd Fidzwan, Ahmad Bareduan, Salleh, Hussin, M.S., Hasnul, M.J. |
---|---|
Format: | Article |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/8050/1/J4742_b11487853372cc202e10a9753ba7bc0a.pdf http://eprints.uthm.edu.my/8050/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Performance evaluation of m3 bottleneck based heuristic for M1M2M3 flow shop
by: Mohd Fidzwan, Md Amin Hamzas, et al.
Published: (2013) -
Development of improved bottleneck-based heuristic for re-entrant flow shop with dominant machine at M1 and M4
by: Mohd Fidzwan, Md Amin Hamzas, et al.
Published: (2013) -
Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
by: Isa, Noor Amira, et al.
Published: (2020) -
Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
by: Bareduan, Salleh Ahmad, et al.
Published: (2012) -
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)