Job shop scheduling using shifting bottleneck heuristic algorithm

Production scheduling is defined as allocating limited resources to do several jobs. PT. Hari Mukti Teknik is a company engaged in manufacturing and engineering in Indonesia. The company implements an FCFS scheduling system with make to order and job shop production system. In order to produce a sch...

Full description

Saved in:
Bibliographic Details
Main Authors: Tamtomo, B. T., Kurniawati, D. A., Yusof, N. M., Wong, K. Y.
Format: Conference or Workshop Item
Published: 2021
Subjects:
Online Access:http://eprints.utm.my/id/eprint/95831/
https://www.scopus.com
Tags: Add Tag
No Tags, Be the first to tag this record!