Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang

Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the facto...

Full description

Saved in:
Bibliographic Details
Main Authors: Nor Haslinda, A., T., Wei Xian, K., Norfarahayu, Rahmat, Muhamad Hanafi, Hasmori, Muhammad Fikri
Format: Conference or Workshop Item
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/7072/1/J6334_62935b3ad6fdf71b0ca5705326c43f7a.pdf
http://eprints.uthm.edu.my/7072/
https://doi.org/10.1088/1742-6596/995/1/012043
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.7072
record_format eprints
spelling my.uthm.eprints.70722022-05-24T01:56:59Z http://eprints.uthm.edu.my/7072/ Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang Nor Haslinda, A. T., Wei Xian K., Norfarahayu Rahmat, Muhamad Hanafi Hasmori, Muhammad Fikri TH Building construction Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants. 2018 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/7072/1/J6334_62935b3ad6fdf71b0ca5705326c43f7a.pdf Nor Haslinda, A. and T., Wei Xian and K., Norfarahayu and Rahmat, Muhamad Hanafi and Hasmori, Muhammad Fikri (2018) Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang. In: ISMAP 2017, October 28, 2017, Batu Pahat, Johor. https://doi.org/10.1088/1742-6596/995/1/012043
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Nor Haslinda, A.
T., Wei Xian
K., Norfarahayu
Rahmat, Muhamad Hanafi
Hasmori, Muhammad Fikri
Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
description Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
format Conference or Workshop Item
author Nor Haslinda, A.
T., Wei Xian
K., Norfarahayu
Rahmat, Muhamad Hanafi
Hasmori, Muhammad Fikri
author_facet Nor Haslinda, A.
T., Wei Xian
K., Norfarahayu
Rahmat, Muhamad Hanafi
Hasmori, Muhammad Fikri
author_sort Nor Haslinda, A.
title Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
title_short Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
title_full Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
title_fullStr Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
title_full_unstemmed Investigation on the factors influencing construction time and cost overrun for high-rise building projects in Penang
title_sort investigation on the factors influencing construction time and cost overrun for high-rise building projects in penang
publishDate 2018
url http://eprints.uthm.edu.my/7072/1/J6334_62935b3ad6fdf71b0ca5705326c43f7a.pdf
http://eprints.uthm.edu.my/7072/
https://doi.org/10.1088/1742-6596/995/1/012043
_version_ 1738581572433477632
score 13.160551