Contributing cost variation factors in highway projects

Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the res...

Full description

Saved in:
Bibliographic Details
Main Authors: Sohu, Samiullah, Abdullah, Abd Halid, Nagapan, Sasitharan, Ahmed Jhatial, Ashfaque, Tahir, Muhammed
Format: Article
Language:English
Published: C.E.J 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/3811/1/AJ%202018%20%2824%29.pdf
http://eprints.uthm.edu.my/3811/
http://dx.doi.org/10.28991/cej-03091115
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.3811
record_format eprints
spelling my.uthm.eprints.38112021-11-22T03:53:26Z http://eprints.uthm.edu.my/3811/ Contributing cost variation factors in highway projects Sohu, Samiullah Abdullah, Abd Halid Nagapan, Sasitharan Ahmed Jhatial, Ashfaque Tahir, Muhammed TE Highway engineering. Roads and pavements TA630-695 Structural engineering (General) TH5011-5701 Construction by phase of the work (Building trades) Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the research a literature review was conducted and 64 general factors of cost overrun were found in construction industry. A questionnaire was developed and distributed among 28 well experienced experts having maximum experience in construction of building projects. Gathered data was analyzed by method of average index. Results shows that main and causative factors of cost variation were financial and cash issues faced by owner, slow information between parties, change in price of material, delay of design, poor site management, payment and financial issues problem faced by the contractor and delay in decision making. This research can help petitioners of highway projects to overcome these main and causative factors of cost. C.E.J 2018 Article PeerReviewed text en http://eprints.uthm.edu.my/3811/1/AJ%202018%20%2824%29.pdf Sohu, Samiullah and Abdullah, Abd Halid and Nagapan, Sasitharan and Ahmed Jhatial, Ashfaque and Tahir, Muhammed (2018) Contributing cost variation factors in highway projects. Civil Engineering Journal, 4 (8). pp. 1793-1798. ISSN 2476-3055 http://dx.doi.org/10.28991/cej-03091115
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
topic TE Highway engineering. Roads and pavements
TA630-695 Structural engineering (General)
TH5011-5701 Construction by phase of the work (Building trades)
spellingShingle TE Highway engineering. Roads and pavements
TA630-695 Structural engineering (General)
TH5011-5701 Construction by phase of the work (Building trades)
Sohu, Samiullah
Abdullah, Abd Halid
Nagapan, Sasitharan
Ahmed Jhatial, Ashfaque
Tahir, Muhammed
Contributing cost variation factors in highway projects
description Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the research a literature review was conducted and 64 general factors of cost overrun were found in construction industry. A questionnaire was developed and distributed among 28 well experienced experts having maximum experience in construction of building projects. Gathered data was analyzed by method of average index. Results shows that main and causative factors of cost variation were financial and cash issues faced by owner, slow information between parties, change in price of material, delay of design, poor site management, payment and financial issues problem faced by the contractor and delay in decision making. This research can help petitioners of highway projects to overcome these main and causative factors of cost.
format Article
author Sohu, Samiullah
Abdullah, Abd Halid
Nagapan, Sasitharan
Ahmed Jhatial, Ashfaque
Tahir, Muhammed
author_facet Sohu, Samiullah
Abdullah, Abd Halid
Nagapan, Sasitharan
Ahmed Jhatial, Ashfaque
Tahir, Muhammed
author_sort Sohu, Samiullah
title Contributing cost variation factors in highway projects
title_short Contributing cost variation factors in highway projects
title_full Contributing cost variation factors in highway projects
title_fullStr Contributing cost variation factors in highway projects
title_full_unstemmed Contributing cost variation factors in highway projects
title_sort contributing cost variation factors in highway projects
publisher C.E.J
publishDate 2018
url http://eprints.uthm.edu.my/3811/1/AJ%202018%20%2824%29.pdf
http://eprints.uthm.edu.my/3811/
http://dx.doi.org/10.28991/cej-03091115
_version_ 1738581170855084032
score 13.18916