Contributing cost variation factors in highway projects

Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the res...

Full description

Saved in:
Bibliographic Details
Main Authors: Sohu, Samiullah, Abdullah, Abd Halid, Nagapan, Sasitharan, Ahmed Jhatial, Ashfaque, Tahir, Muhammed
Format: Article
Language:English
Published: C.E.J 2018
Subjects:
Online Access:http://eprints.uthm.edu.my/3811/1/AJ%202018%20%2824%29.pdf
http://eprints.uthm.edu.my/3811/
http://dx.doi.org/10.28991/cej-03091115
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the research a literature review was conducted and 64 general factors of cost overrun were found in construction industry. A questionnaire was developed and distributed among 28 well experienced experts having maximum experience in construction of building projects. Gathered data was analyzed by method of average index. Results shows that main and causative factors of cost variation were financial and cash issues faced by owner, slow information between parties, change in price of material, delay of design, poor site management, payment and financial issues problem faced by the contractor and delay in decision making. This research can help petitioners of highway projects to overcome these main and causative factors of cost.