Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling
This paper proposes a new heuristic that introduces the method of bottleneck-based (BNB) at the beginning of an initial sequence determination with the objective of make span minimization for large size problem. Earlier studies found that the scheduling activity become complicated when dealing with...
Saved in:
Main Authors: | , |
---|---|
其他作者: | |
格式: | Book Section |
语言: | English |
出版: |
Penerbit UTHM
2020
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/3095/1/Ch07.pdf http://eprints.uthm.edu.my/3095/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!