Methodology to develop bottleneck-based heuristic for permutation flow shop scheduling

This paper proposes a new heuristic that introduces the method of bottleneck-based (BNB) at the beginning of an initial sequence determination with the objective of make span minimization for large size problem. Earlier studies found that the scheduling activity become complicated when dealing with...

Full description

Saved in:
Bibliographic Details
Main Authors: Isa, Noor Amira, Ahmad Bareduan, Salleh
Other Authors: Ismail, Al Emran
Format: Book Section
Language:English
Published: Penerbit UTHM 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/3095/1/Ch07.pdf
http://eprints.uthm.edu.my/3095/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items