A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system

The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this,...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Zarina
Format: Thesis
Language:English
English
English
Published: 2014
Subjects:
Online Access:http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf
http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf
http://eprints.uthm.edu.my/1709/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uthm.eprints.1709
record_format eprints
spelling my.uthm.eprints.17092021-10-04T08:45:44Z http://eprints.uthm.edu.my/1709/ A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system Ibrahim, Zarina TK Electrical engineering. Electronics Nuclear engineering TK1001-1841 Production of electric energy or power. Powerplants. Central stations The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising. 2014-01 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf text en http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf Ibrahim, Zarina (2014) A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system. Masters thesis, Universiti Tun Hussein Onn Malaysia.
institution Universiti Tun Hussein Onn Malaysia
building UTHM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
url_provider http://eprints.uthm.edu.my/
language English
English
English
topic TK Electrical engineering. Electronics Nuclear engineering
TK1001-1841 Production of electric energy or power. Powerplants. Central stations
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
TK1001-1841 Production of electric energy or power. Powerplants. Central stations
Ibrahim, Zarina
A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
description The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising.
format Thesis
author Ibrahim, Zarina
author_facet Ibrahim, Zarina
author_sort Ibrahim, Zarina
title A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
title_short A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
title_full A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
title_fullStr A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
title_full_unstemmed A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system
title_sort comparative study of the ahp and topsis methods for implementing load shedding scheme in a pulp mill system
publishDate 2014
url http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf
http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf
http://eprints.uthm.edu.my/1709/
_version_ 1738580895242125312
score 13.160551