A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system

The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this,...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Zarina
Format: Thesis
Language:English
English
English
Published: 2014
Subjects:
Online Access:http://eprints.uthm.edu.my/1709/1/24p%20ZARINA%20IBRAHIM.pdf
http://eprints.uthm.edu.my/1709/2/ZARINA%20IBRAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1709/3/ZARINA%20IBRAHIM%20WATERMARK.pdf
http://eprints.uthm.edu.my/1709/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising.